Category: Coke
Location: Košice, Slovak Republic
Implementation: 2018
Description:
Next stage of the replacement of the collector mains on the large-volume coke oven battery block has been realized by reason of unsatisfactory condition of existing facilities. During the reconstruction, the collecting mains were replaced on one block of the battery. The project has been realized during the full operation of adjacent blocks of COB. Relevant block of COB was without coke and there were kept special thermal regime in it. Replacement was successfully executed in planned term 24 days and on agreed conditions.